Skip to main content
Blog

On-Chain Engineering

Deep dives into EVM internals, smart contract patterns, and the infrastructure behind block explorers.

Cover image for 720 IP Addresses Is All It Takes to Isolate an Ethereum Node in 2026
Ethereum Oct 1 8 min read by Antoine

720 IP Addresses Is All It Takes to Isolate an Ethereum Node in 2026

A 2026 WWW paper eclipses post-Merge Ethereum nodes with a five-stage attack, reopening a threat the 2018 Kademlia fix was supposed to have closed.

Cover image for Ethereum's Block Gossip Has a Bandwidth Problem. The Fix Trades Away Security on Purpose.
Ethereum Sep 13 8 min read by Antoine

Ethereum's Block Gossip Has a Bandwidth Problem. The Fix Trades Away Security on Purpose.

A 2026 ethresear.ch proposal optimizes RLNC block propagation by shrinking a formal security margin, and says so explicitly, with the math shown.

Cover image for One Agent Contract, Six Draft Standards: Ethereum's Composability Tax
AI Agents Sep 9 8 min read by Antoine

One Agent Contract, Six Draft Standards: Ethereum's Composability Tax

Ten Draft ERCs now define pieces of the AI agent stack. Here's how to verify which ones a deployed contract actually implements.

Cover image for Ethereum Fixed Its Block-Broadcast Speed Problem. It Just Found a Second Deadline to Worry About.
Ethereum Sep 7 8 min read by Antoine

Ethereum Fixed Its Block-Broadcast Speed Problem. It Just Found a Second Deadline to Worry About.

A devnet benchmark cut execution payload propagation from 4.89s to 0.73s. But ePBS's new PTC deadline still has no defense against strategic delay.

Cover image for The Transaction State Your Block Explorer Can't See Yet
AI Agents Sep 5 8 min read by Antoine

The Transaction State Your Block Explorer Can't See Yet

ERC-8166 defines a standard interface for shared sequencers, giving agents and explorers a common way to poll pending transaction status across L2s.

Cover image for The DEX Trade That Was Never on a DEX
DeFi Aug 23 7 min read by Antoine

The DEX Trade That Was Never on a DEX

Most 'DEX aggregator' swaps now settle against off-chain market maker quotes, not AMM pools. Here's what RFQ liquidity means for on-chain trust.

Cover image for Trustless, Except for Three Bugs: OpenZeppelin's Audit of ERC-7888's Cross-Chain Broadcaster
ERC-7888 Aug 13 7 min read by Antoine

Trustless, Except for Three Bugs: OpenZeppelin's Audit of ERC-7888's Cross-Chain Broadcaster

OpenZeppelin audited ERC-7888's storage-proof Broadcaster across six L2s and found three high-severity bugs, including one that resolved to the wrong contract.

Cover image for AUCIL Was Built to Remove Ethereum's Inclusion-List Trust Problem. A Sybil Attack Just Moved It.
Ethereum Aug 9 8 min read by Antoine

AUCIL Was Built to Remove Ethereum's Inclusion-List Trust Problem. A Sybil Attack Just Moved It.

A July 2026 ethresear.ch post shows AUCIL's auction-based inclusion lists aren't Sybil-proof, undermining the censorship guarantee they were built to protect.

Cover image for PeerDAS Has Been Live for 8 Months. Here's How Ethereum Verifies It's Actually Working.
Ethereum Jul 29 8 min read by Antoine

PeerDAS Has Been Live for 8 Months. Here's How Ethereum Verifies It's Actually Working.

Fusaka replaced full blob replication with probabilistic custody sampling. Here's how dasmon and the wider ecosystem verify nodes actually honor it.

Cover image for Zero-Capital Bootstrapping: The Stablecoin That Mints Its Own Equity Layer
DeFi Jul 28 7 min read by Antoine

Zero-Capital Bootstrapping: The Stablecoin That Mints Its Own Equity Layer

A Feb 2026 ethresear.ch proposal co-issues a T-bill stablecoin and equity token, seeding their own Uniswap v4 pool with zero external capital.

Cover image for After the Scanner Runs: The Audit Workflow Step That Lets Logical Vulnerabilities Through
Security Jul 26 6 min read by Antoine

After the Scanner Runs: The Audit Workflow Step That Lets Logical Vulnerabilities Through

Full call graphs overwhelm DeFi auditors. Pattern-scoped visualization targets exactly the structural context you need. Here's how to build the workflow.

Cover image for The Mempool Rule That Blocked Privacy Pools: How EIP-8272 Works Around It
Privacy Jul 24 7 min read by Antoine

The Mempool Rule That Blocked Privacy Pools: How EIP-8272 Works Around It

EIP-8272 lets frame transactions declare Merkle root dependencies at the protocol level, solving the storage read prohibition that blocked native privacy...

Cover image for The Execution Window Your Reentrancy Guard Leaves Open
Security Jul 22 7 min read by Antoine

The Execution Window Your Reentrancy Guard Leaves Open

nonReentrant blocks same-contract reentrancy. Read-only reentrancy exploits mid-execution state in external contracts, a window no modifier can close.

Cover image for ERC-8004: The Registry Under the Agent Economy
AI Agents Jul 20 7 min read by Antoine

ERC-8004: The Registry Under the Agent Economy

ERC-8004 deploys three onchain singletons for agent identity, reputation, and validation. Here's how the mechanics actually work.

Cover image for Expire at Midnight: EIP-8130 Session Keys, Expiry, and Policy Gates
Account Abstraction Jul 16 7 min read by Antoine

Expire at Midnight: EIP-8130 Session Keys, Expiry, and Policy Gates

EIP-8130 builds session keys from three fields in one storage slot. How actor expiry, scope, and policy gates compose into a complete authorization primitive.

Cover image for The 2x Mint: When Wrapping a Token Creates Its Own Liquidity
DeFi Jul 12 8 min read by Antoine

The 2x Mint: When Wrapping a Token Creates Its Own Liquidity

The 2x mint collapses wrapping and liquidity provision into one transaction. How it works, why deposits can't move prices, and what's unresolved.

Cover image for The Triage Problem: Why Your Smart Contract Scanner's 87 Findings Contain One Real Bug
Security Jul 8 7 min read by Antoine

The Triage Problem: Why Your Smart Contract Scanner's 87 Findings Contain One Real Bug

Automated scanners generate 40-90 findings per 1,000 lines. Under 10% are real. Here's what research says about fixing the triage problem.

Cover image for The 22-Byte Tax on Every Solidity Addition (And How EIP-8219 Ends It)
EIP-8219 Jul 6 7 min read by Antoine

The 22-Byte Tax on Every Solidity Addition (And How EIP-8219 Ends It)

Solidity 0.8 safe addition costs 79 gas and 22 bytes of bytecode. EIP-8219 proposes a single opcode that does the same in 5 gas and 1 byte.

Cover image for The Transfer Event Ethereum Was Missing: How EIP-7708 Makes ETH Observable
EIP-7708 Jul 4 7 min read by Antoine

The Transfer Event Ethereum Was Missing: How EIP-7708 Makes ETH Observable

EIP-7708 makes every native ETH transfer emit a Transfer log in Glamsterdam. Here's what changes for indexers, explorers, and smart contract wallets.

Cover image for Lanes, Not Lines: EIP-8130's 2D Nonce Channels and Nonce-Free Mode
Account Abstraction Jul 2 7 min read by Antoine

Lanes, Not Lines: EIP-8130's 2D Nonce Channels and Nonce-Free Mode

EIP-8130 replaces the single nonce counter with independent parallel channels and a nonce-free expiry mode. Here's how nonce_key and replay_id work.

Cover image for The Payer That Can't Send: EIP-8130's Owner Scope Model
Account Abstraction Jun 30 7 min read by Antoine

The Payer That Can't Send: EIP-8130's Owner Scope Model

EIP-8130 adds a scope byte to every owner slot: gas-only payers, config-only cold keys, signing-only verifiers, all enforced at the protocol level.

Cover image for Who Called You? EIP-8130's Self-Call Model, TX_CONTEXT, and Phase Atomicity
Account Abstraction Jun 28 7 min read by Antoine

Who Called You? EIP-8130's Self-Call Model, TX_CONTEXT, and Phase Atomicity

EIP-8130 makes msg.sender the actual user, not EntryPoint. Here's what TX_CONTEXT, phase atomicity, and policy gates mean for contract authors.

Cover image for The Handshake That Finally Admits What History You Have
Ethereum Jun 26 7 min read by Antoine

The Handshake That Finally Admits What History You Have

eth/69 (EIP-7642) ships in Fusaka: total difficulty removed, block range advertised, and 530 GB of bloom filter data cut from the full sync path.

Cover image for The Prover Ran. The Property Was Wrong.
Security Jun 24 6 min read by Antoine

The Prover Ran. The Property Was Wrong.

Formal verification proves a contract satisfies its specified properties. It says nothing about properties nobody wrote. This is the spec problem.

Cover image for The Implicit Rule Your Auditor Couldn't Check
Security Jun 22 6 min read by Antoine

The Implicit Rule Your Auditor Couldn't Check

LogicScan treats deployed on-chain protocols as a ground-truth specification for business invariants, flagging what no written spec ever captured.

Cover image for The Attack Window Your Audit Can't Close: Proxy Security Beyond Code Review
Security Jun 20 7 min read by Antoine

The Attack Window Your Audit Can't Close: Proxy Security Beyond Code Review

54% of Ethereum contracts are proxies. The attack surface isn't in the code, it's in deployment. Here's what auditors structurally can't see.

Cover image for The Free Option Hidden in ePBS: Why Builders Can Walk Away From a Committed Block
Ethereum Jun 18 8 min read by Antoine

The Free Option Hidden in ePBS: Why Builders Can Walk Away From a Committed Block

EIP-7732 gives builders a short window to walk away from committed payloads. Research puts the average withhold rate at 0.82%, up to 6% on volatile days.

Cover image for Why the Ethereum Blobpool Consumes 4x More Bandwidth Than the Consensus Layer
Ethereum Jun 16 7 min read by Antoine

Why the Ethereum Blobpool Consumes 4x More Bandwidth Than the Consensus Layer

Fusaka devnet data shows EL blobpool traffic running 4-5x higher than CL blob gossip. EIP-8070's custody-aligned sampling fixes that.

Cover image for The EVM Has No CALL/RET. Here's What It Costs Every L2.
EIP-8173 Jun 14 7 min read by Antoine

The EVM Has No CALL/RET. Here's What It Costs Every L2.

EIP-8173 makes the historical case for static EVM control flow. Here's what the missing CALL/RET instruction costs ZK provers, L2 clients, and block explorers.

Cover image for Your NVMe Is Fast. Your Ethereum Node Doesn't Care.
EIP-7870 Jun 12 7 min read by Antoine

Your NVMe Is Fast. Your Ethereum Node Doesn't Care.

EIP-7870's realistic minimum update added IOPS floors to Ethereum node hardware requirements. Here's why sequential MB/s doesn't matter and what does.

Cover image for The Sync That Never Finishes: How snap/2 Replaces Trie Healing
EIP-8189 Jun 10 7 min read by Antoine

The Sync That Never Finishes: How snap/2 Replaces Trie Healing

EIP-8189 replaces snap/1's iterative trie healing with deterministic BAL replay. Here's why the old approach can't converge and what changes in snap/2.

Cover image for The Call Graph Your Auditor Never Drew
Security Jun 8 8 min read by Antoine

The Call Graph Your Auditor Never Drew

Three visualization commands that reveal what Slither's 92 detectors can't see: topological bugs in call graphs, inheritance trees, and state machines.

Cover image for Valid Signature, Wrong Intent: The Unsolved Authorization Problem for Onchain AI Agents
AI Agents Jun 6 8 min read by Antoine

Valid Signature, Wrong Intent: The Unsolved Authorization Problem for Onchain AI Agents

Session keys and ERC-8181 bitmaps constrain what agents can do. Neither captures what you meant. Here's the intent gap the 2026 agent standards didn't close.

Cover image for The Agent Franchise Model: How ERC-8170's Genesis Contract Makes AI Ownership Trustless
AI Agents Jun 4 7 min read by Antoine

The Agent Franchise Model: How ERC-8170's Genesis Contract Makes AI Ownership Trustless

ERC-8170 replaces agent ownership with reproduction. The Genesis Contract makes access revocation trustless: no oracles, no liveness dependencies.

Cover image for The Callability Gap: Why Smart Contracts Still Can't Trade Like Professionals
DeFi Jun 2 7 min read by Antoine

The Callability Gap: Why Smart Contracts Still Can't Trade Like Professionals

Smart contracts can swap tokens but can't place a limit order. DeCeFi proposes an oracle-style execution gateway that closes the callability gap.

Cover image for After the Audit: The Monitoring Stack That Catches What Static Analysis Can't
Security May 30 7 min read by Antoine

After the Audit: The Monitoring Stack That Catches What Static Analysis Can't

Your audit covers the code on the day it was reviewed. Post-deployment monitoring covers every day after. Here's what the stack looks like.

Cover image for The Oracle Your Auditor Can't Read
Security May 28 7 min read by Antoine

The Oracle Your Auditor Can't Read

AI-powered oracles create an attack surface Slither can't see. Here's what on-chain model provenance looks like in Solidity.

Cover image for The Security Bug in Your Font: How ERC-8117 Turns Address Display Into a Defense Layer
Security May 26 7 min read by Antoine

The Security Bug in Your Font: How ERC-8117 Turns Address Display Into a Defense Layer

Address poisoning cost the ecosystem $500M+. ERC-8117 fixes the attack at the display layer. Here's what it does and how to implement it.

Cover image for After Governance Capture: The Math of ETH-Staked Oracle Security
Security May 20 8 min read by Antoine

After Governance Capture: The Math of ETH-Staked Oracle Security

The ETH-staked oracle proposal replaces governance tokens with ETH stakes and quadratic voting. Here's what the math actually says, and where it still breaks.

Cover image for The Agent That Can't Prove What It Did
AI Agents May 18 7 min read by Antoine

The Agent That Can't Prove What It Did

ERC-8183 proves payment was released. ERC-8165 and ERC-8171 are building the missing layer: verifiable execution context for multi-step agent plans.

Cover image for The Gas Number That Just Became Two: Inside EIP-8037's Multidimensional Gas Metering
Ethereum May 18 7 min read by Antoine

The Gas Number That Just Became Two: Inside EIP-8037's Multidimensional Gas Metering

EIP-8037 finalizes multidimensional gas metering for Ethereum, splitting gas into execution and state pools. What breaks, and what to audit before Glamsterdam.

Cover image for What Does It Mean to Sell an AI Agent? Three Standards, Three Incompatible Answers
AI Agents May 16 7 min read by Antoine

What Does It Mean to Sell an AI Agent? Three Standards, Three Incompatible Answers

ERC-7857, ERC-8170, and ERC-8181 each define agent ownership differently. The standard you pick becomes an architectural dependency.

Cover image for How an AI Auditor Learned to Find Bugs by Reading 270 Hack Reports
Security May 14 7 min read by Antoine

How an AI Auditor Learned to Find Bugs by Reading 270 Hack Reports

A March 2026 agentic auditing system built a knowledge graph from 270 Code4rena reports and found every high-severity bug in 12 production contracts.

Cover image for The EVM Has No Subroutines. Here's Why That's a ZK Problem, and the Fix
EIP-7979 May 12 7 min read by Antoine

The EVM Has No Subroutines. Here's Why That's a ZK Problem, and the Fix

EIP-7979 adds CALLSUB/ENTERSUB/RETURNSUB to the EVM. Three opcodes that cut ZK proof size 50% and solve a quadratic control flow problem from 2015.

Cover image for When the Oracle Is the Attack: Governance Capture in Prediction Markets
Security May 10 8 min read by Antoine

When the Oracle Is the Attack: Governance Capture in Prediction Markets

How $20B in prediction market volume exposed a structural flaw in governance-token oracles, and what the UMA attack on Polymarket reveals about oracle...

Cover image for Hardhat, Foundry, Brownie, Truffle, or Ape: Which EVM Framework Does Your Team Actually Need in 2026?
Developer Tooling May 8 13 min read by Antoine

Hardhat, Foundry, Brownie, Truffle, or Ape: Which EVM Framework Does Your Team Actually Need in 2026?

Compare Hardhat, Foundry, Brownie, Truffle, and Ape for EVM development in 2026. Survey data, code examples, and a decision framework by team type.

Cover image for Block Explorer for Your Arbitrum Orbit Chain: Arbiscan, Blockscout, Ethernal, and Routescan Compared
Infrastructure May 6 13 min read by Antoine

Block Explorer for Your Arbitrum Orbit Chain: Arbiscan, Blockscout, Ethernal, and Routescan Compared

Arbiscan, Blockscout, Ethernal, and Routescan compared for Arbitrum Orbit chains. Bridge UI, AnyTrust support, setup time, pricing, and a decision framework.

Cover image for Six Ways to Read a Transaction: EVM Tracing Tools Compared
Security May 4 12 min read by Antoine

Six Ways to Read a Transaction: EVM Tracing Tools Compared

Tenderly, Phalcon, Foundry, Hardhat, Ethernal, and OpenChain compared by setup, call tree depth, state diff, gas profiling, and pricing.

Cover image for The Missing Verb: How ERC-8165 Gives AI Agents an Execution Model
AI Agents May 2 8 min read by Antoine

The Missing Verb: How ERC-8165 Gives AI Agents an Execution Model

ERC-8165 gives AI agents a standard execution model: declare an outcome, let solvers compete to fulfill it. How the intent struct and settlement loop work.

Cover image for One Block Field, Three Hard Problems: Inside EIP-7928's Block-Level Access Lists
EIP-7928 Apr 26 7 min read by Antoine

One Block Field, Three Hard Problems: Inside EIP-7928's Block-Level Access Lists

EIP-7928 adds one field to every block header and unlocks parallel execution, deterministic state healing, and executionless sync. Here's how it works.

Cover image for The Token Approval Attack Surface That Grows With Every Fix
Security Apr 24 8 min read by Antoine

The Token Approval Attack Surface That Grows With Every Fix

ERC-20's allowance race condition spawned a fix that cost $24M. ERC-7410 added spender griefing. ERC-6960 multiplied the surface. Here's the pattern.

Cover image for Blobs as a Message Bus: How ERC-8180 Adds Authentication to EIP-4844
ERC-8180 Apr 22 7 min read by Antoine

Blobs as a Message Bus: How ERC-8180 Adds Authentication to EIP-4844

ERC-8180 turns EIP-4844 blobs into a permissionless authenticated message bus. Vitalik co-authored. Here's how the trust separation actually works.

Cover image for The Attack Taxonomy DeFi Security Has Been Ignoring
Security Apr 20 7 min read by Antoine

The Attack Taxonomy DeFi Security Has Been Ignoring

A March 2026 survey of 235 papers found that DeFi attack patterns map to CWE entries documented since the 1970s. Here's what auditors are missing.

Cover image for The Agent That Owns Itself: How ERC-8181 Builds Self-Sovereign AI on EVM
AI Agents Apr 18 8 min read by Antoine

The Agent That Owns Itself: How ERC-8181 Builds Self-Sovereign AI on EVM

ERC-8181 closes the self-sovereignty gap in AI agent design: an NFT that owns its own wallet, with state anchoring and executor permissions onchain.

Cover image for From Ciphertext to Commitment: How LUCID and EIP-8182 Carve Up Ethereum's Privacy Problem
Ethereum Apr 10 8 min read by Antoine

From Ciphertext to Commitment: How LUCID and EIP-8182 Carve Up Ethereum's Privacy Problem

Two 2026 EIPs attack different layers of Ethereum's privacy problem. LUCID encrypts the mempool scheduling decision. EIP-8182 hides what happened after.

Cover image for The Missing Subscription Primitive: How ERC-8191 Standardizes On-Chain Recurring Payments
ERC-8191 Apr 6 8 min read by Antoine

The Missing Subscription Primitive: How ERC-8191 Standardizes On-Chain Recurring Payments

ERC-1337 failed. ERC-5643 is too narrow. ERC-8191 learns from both: a pull-based subscription lifecycle with soft-fail collection and a keeper model.

Cover image for The Provenance Gap: Why Smart Contracts Can't See NFT Transfer History
NFT Apr 4 7 min read by Antoine

The Provenance Gap: Why Smart Contracts Can't See NFT Transfer History

EIP-8042 proposes on-chain ownership history for ERC-721. Here's why event logs break composability and how the three-layer model fixes it.

Cover image for The State Growth Tax: Inside Ethereum's Proposal to Charge You for Dormant State
Ethereum Apr 2 7 min read by Antoine

The State Growth Tax: Inside Ethereum's Proposal to Charge You for Dormant State

New EIP draft prices SSTORE by age: dormant state costs more to write. How period tracking works and what this means for DeFi protocols with idle positions.

Cover image for FOCIL Explained: How Ethereum Is Hardcoding Censorship Resistance Into the Protocol
Ethereum Mar 30 8 min read by Antoine

FOCIL Explained: How Ethereum Is Hardcoding Censorship Resistance Into the Protocol

EIP-7805 adds a 16-validator committee that can't be collectively bribed. How FOCIL works across CL, EL, and Engine API, Ethereum's H2 2026 headliner.

Cover image for The Address That Existed Before the Contract: ERC-8185 and ERC-8186
ERC-8185 Mar 28 8 min read by Antoine

The Address That Existed Before the Contract: ERC-8185 and ERC-8186

ERC-8185 and ERC-8186 create deterministic on-chain addresses for GitHub repos, domains, and npm packages, before their owners have ever touched Ethereum.

Cover image for Four Slots, Sixteen Chunks: Inside EIP-7864 and the New Cost of Contract Storage Layout
EIP-7864 Mar 27 8 min read by Antoine

Four Slots, Sixteen Chunks: Inside EIP-7864 and the New Cost of Contract Storage Layout

EIP-7864 replaces Ethereum's state trie with a unified binary tree that colocates a handful of storage slots with the account header. Here's what that changes.

Cover image for The Mandate Pattern: Bounded Execution Authority for ERC-4626 Vaults
DeFi Mar 26 7 min read by Antoine

The Mandate Pattern: Bounded Execution Authority for ERC-4626 Vaults

ERC-8192 fills the gap ERC-4626 left open: how to delegate vault execution to AI agents and solvers without giving up risk control.

Cover image for The Frame Wallet: What EIP-8141 Means for Every EOA
Account Abstraction Mar 24 8 min read by Antoine

The Frame Wallet: What EIP-8141 Means for Every EOA

EIP-8141 gives unmodified EOAs gas abstraction via default code and a new frame execution model. No bundlers, no migration, no new wallet.

Cover image for When Provers Race: The Coordination Problem in Decentralized ZK
ZK Mar 22 7 min read by Antoine

When Provers Race: The Coordination Problem in Decentralized ZK

Concurrent ZK provers collide at 33K gas per failure. Why the coordination problem is hard and what three proposed mechanisms look like.

Cover image for Best Block Explorers for EVM Chains in 2026
Infrastructure Mar 21 12 min read by Antoine

Best Block Explorers for EVM Chains in 2026

Compare EVM block explorers in 2026: Etherscan, Blockscout, Ethernal, Tenderly, Blockchair, Routescan. Setup speed, pricing, and a decision framework.

Cover image for The Bug Your Auditor's Tools Will Never Catch
Security Mar 20 8 min read by Antoine

The Bug Your Auditor's Tools Will Never Catch

Static analysis and fuzzing miss a whole class of smart contract vulnerabilities. Here's what logical bugs look like and how to find them.

Cover image for One Signature, Every Chain: EIP-8130's Protocol-Level Account Abstraction
Account Abstraction Mar 18 7 min read by Antoine

One Signature, Every Chain: EIP-8130's Protocol-Level Account Abstraction

EIP-8130 proposes native AA with chainId=0 config sync. No bundlers, no per-chain key rotations. Here's how the mechanism actually works.

Cover image for How Three Infrastructure Failures Turned a $50M Collateral Swap into $36K
DeFi Mar 16 9 min read by Antoine

How Three Infrastructure Failures Turned a $50M Collateral Swap into $36K

A $50M Aave collateral swap returned $36K. Three compounding CoW Protocol failures made the worst possible route the only one available.

Cover image for ERC-8183: How to Make AI Agent Payments Verifiable Onchain
AI Agents Mar 16 8 min read by Antoine

ERC-8183: How to Make AI Agent Payments Verifiable Onchain

ERC-8183 lets an AI agent commit to pay-on-delivery instead of paying upfront. How its job lifecycle and onchain evaluator make agent commerce verifiable.

Cover image for The Shape-Shifting Agent: Mutable Configuration Is Ethereum's Next AI Security Problem
AI Agents Mar 14 8 min read by Antoine

The Shape-Shifting Agent: Mutable Configuration Is Ethereum's Next AI Security Problem

ERC-8172 proposes block-delayed metadata updates for AI agents. Here's why the problem is harder than it looks, and what the full defense stack looks like.

Cover image for EVM Opcodes 101: What Happens When You Send a Transaction
EVM Mar 12 8 min read by Antoine

EVM Opcodes 101: What Happens When You Send a Transaction

EVM opcodes are the low-level instructions behind every Ethereum transaction. Learn how stack, memory, storage, and gas costs work.

Cover image for What Is a Layer 2, and Why Does Your Rollup Need a Block Explorer?
Infrastructure Mar 10 7 min read by Antoine

What Is a Layer 2, and Why Does Your Rollup Need a Block Explorer?

L2 rollups process thousands of transactions off-chain, but without a block explorer, debugging and verification become guesswork.

Cover image for Public EVM Block Explorers
Ethernal Dec 19 4 min read by Antoine

Public EVM Block Explorers

Spin up public block explorers for your EVM chains. Custom domains, contract verification, token transfers, and Metamask integration.

Cover image for Data Retention Changes
Ethernal Oct 3 1 min read by Antoine

Data Retention Changes

Data will now be cleared after 7 days for free plan users.

Cover image for Ethernal x Tenderly
Ethernal Feb 11 2 min read by Antoine

Ethernal x Tenderly

Set up a block explorer for your Tenderly forks. Debug transactions sent through Ethernal's UI directly in Tenderly.

Cover image for Ethernal Is Going Open Source!
Ethernal Oct 18 2 min read by Antoine

Ethernal Is Going Open Source!

Ethernal's code is now publicly available on GitHub. The hosted version now has free and paid tiers.

Cover image for Transaction Tracing with Ethernal
Ethernal May 26 4 min read by Antoine

Transaction Tracing with Ethernal

Easily see which contracts were called or created during the execution of a function. A deep dive into Ethernal's transaction tracing feature.

Cover image for Interact with Mainnet Contracts on Your Local Fork
Ethernal May 3 1 min read by Antoine

Interact with Mainnet Contracts on Your Local Fork

Import contracts from Etherscan into your Ethernal dashboard to interact with them on your local mainnet fork.

Cover image for Ethernal x Alchemy
Ethernal Apr 29 3 min read by Antoine

Ethernal x Alchemy

Add a webhook in your Alchemy dashboard and get a block explorer for your dapp. Automatic transaction syncing and decoded function calls.